Consultancy Services for Preliminary Engineering Design of Nyagwethe – Sori – Muhuru Bay, and Spur Roads [Approx 176km], and Associated Civil Works for the Fibre Optic Cable.

Open: 25 Feb, 2026 Close: 17 Mar, 2026
Construction Consultancy Roads and Highways-Bridge Roadways Road works
Select a Plan